Civil engineering site at golden hour with excavator silhouettes and freshly laid groundworks

[ CIVIL ENGINEERING CONTRACTORS — DUBLIN, IRELAND ]

Engineering the ground Ireland builds on.

Groundworks, drainage, roads and site development delivered with precision, safety and certainty — from first excavation to final surface.

EST. 2019 N 53.3326° / W 6.2577° SCROLL

[ 01 — WHO WE ARE ]

Every project starts below ground. We are a Dublin civil engineering contractor delivering the foundations, drainage and infrastructure that everything else depends on — built right, built safe, built to last.

About Merlot
Merlot Civil engineering crew reviewing site drawings on location

[ 02 — SERVICES ]

What we build.

01
Bulk excavation and foundation formation on a civil engineering site

Groundworks & Excavation

Site clearance, bulk excavation, cut & fill, foundations and formation levels.

  • EXCAVATION
  • FOUNDATIONS
  • SITE PREP
02
Storm drainage pipe laying with manhole construction

Drainage & Water Infrastructure

Foul and storm drainage, attenuation systems, manholes and watermain connections.

  • FOUL & STORM
  • ATTENUATION
  • WATERMAINS
03
Kerb laying and macadam surfacing on new estate road

Roads, Paving & Surfacing

Estate roads, car parks, kerbing, footpaths and macadam surfacing.

  • ROADS
  • KERBING
  • SURFACING
04
TOPSOIL SUBSOIL FIRM CLAY DUCT BANK — 4 No. 2.400 ESB / FIBRE / TELECOM

Utilities & Ducting

ESB, telecom and fibre ducting, trenching, chambers and service connections.

  • ESB
  • FIBRE
  • TRENCHING
05
F.F.L. +42.300 NEW ROAD C/L S.W. RUN EXIST. G.L. +41.850 PLATFORM — 12 No. UNITS

Site Development

Full enabling works and infrastructure packages for residential and commercial developments.

  • ENABLING WORKS
  • INFRASTRUCTURE
  • PACKAGES
06
SLAB 300 THK. B16 @ 200 c/c B.W. RETAINING WALL — RC WATERBAR / KICKER SECTION A–A

Concrete & Structural Works

Reinforced concrete bases, retaining walls, slabs and structural elements.

  • RC WORKS
  • RETAINING WALLS
  • SLABS
01 / 06
2019Established in Dublin
6Core civil services
100%Safe Pass certified crews
0Lost-time incidents target

[ 03 — APPROACH ]

Measured at every stage.

  1. 01

    Survey & Assessment

    Site investigation, levels and constraints mapped before a machine moves.

  2. 02

    Planning & Programme

    Methodology, sequencing, temporary works and safety plans agreed up front.

  3. 03

    Mobilise

    The right crew, plant and materials on site when promised.

  4. 04

    Build & Control

    Daily quality checks, as-built records and clear client reporting.

  5. 05

    Handover

    Tested, certified and documented, ready for the next trade.

[ 05 — SECTORS ]

  • 01Residential
  • 02Commercial
  • 03Industrial
  • 04Public & Infrastructure
  • 05Utilities

[ 06 — SAFETY & QUALITY ]

Safety isn't a section of the job. It's the job.

Safe Pass & CSCS certified crews

Every operative on site holds current certification, with records maintained on file.

Site-specific safety plans

Written for each site, reviewed before mobilisation and updated as works progress.

Quality-checked as-built records

Daily checks and surveyed as-builts handed over as a complete, auditable pack.

Environmental & waste management

Silts, fuels and arisings controlled and documented to current requirements.

Have a site that needs breaking ground?

[ 07 — CONTACT ]

Start with the ground.

OFFICE
Dublin, Ireland
EMAIL
PHONE
HOURS
Mon–Fri 7:30–17:30